Steps to Building a House
From the beginning to the end, there are numerous construction stages involved in building construction. Building construction is a labor-intensive and financially demanding process. Building construction involves a lot of step-by-step labour that requires a lot of time.
Building construction is a long-term resource for us. The construction of residential buildings is a methodical procedure that is executed by trained labourers, architects, structural engineers, and civil engineers.
Constructing a house is an ongoing endeavour. so that as it is being constructed, a number of issues are addressed. As a result, key factors related to the many phases of building construction, including the building's intended use, financial viability, labour demand, and so on, should be considered prior to designing the structure.
Steps in the Building Construction Process
A. Pre-construction Steps (Phase – I)
- Acquire Land
- Seek Technical/Consultant
- Design Process
- Preparing Estimate and Budget
- Building Permits
- Approach a Contractor
- Building Warranty Period
Learn More
Civil Engineering Basic Knowledge
Thumb Rules for Civil Engineers And Quantity Surveyors
How To Calculate Asphalt Quantity For Road
deflection angle with theodolite
B. Building Construction Step (Phase – II)
- Site Clearance
- Excavation and PCC
- Foundation
- Plinth Beam or Slab
- Superstructure Column and Beam
- Brick Masonry Work
- Lintel Over Door Window
- Floor Slab or Roof Structure
- Plastering
- Door and Window Framing and Fixations
- Painting
- Electrical and Plumbing
- Woodwork and Fixture Fittings
- Boundary Wall
Building Construction Step (Phase – II)
A. Pre-construction Steps (Phase – I)
The pre-construction step in the building construction process includes issues like plot hiring, planting, contractor, budget, consultation hiring, design process, etc.
1. Acquire Land
- This step is considered to be an important step in building construction. The location of the corresponding building is selected for the purposes required for building construction. All the desired facilities available nearby are considered while selecting the land. It should be free from any land-related problems.
- Before buying land or a plot, collect all the data about the land of that place or get information by doing online research about that land. Also, get information about the effective value of that land with the help of real estate agents or other individuals
2. Seek Technical/Consultant
Subsequently, the structural engineer and the architect will talk about various structural components needed for building construction. These include foundation depth, structural engineering, foundation size, and the size of the structural element's component elements.
3. Design Process
4. Preparing Estimate and Budget
The Building Estimator creates an Excel sheet that displays the expected cost of building construction by estimating the quantity of material needed for the various building elements and the number of different pieces of work.
If funds are scarce, authorization for a loan should be obtained beforehand so that the structure can be constructed. Should there be a financial crisis, the construction project might take longer.
5. Building Permits
Several boards have given their approval for the plan and documentation created for the project's execution to be implemented. These several boards include pollution control, airport authority, and municipal.
Obtaining the necessary paperwork is done before submitting a building permit application. States may differ in the information contained within, although some documents are typically needed for the construction of every building.
The list of different documents needed for building construction is shown below.
Land Survey
All plans, elevations, sections, and soil test reports
Architect Certificate Structural Certificate
6. Approach a Contractor
The constructor is required to pre-inspect the finished product before assigning tasks. Additionally, the builder's contract document needs to explicitly express the pertinent specification for the work.
According to the terms of the contract and the specifics of the work, expenses are paid. The document should include information on the building's layout as well as the specifics of the work. Prior to the builder signing the contract, you should review its contents
7. Building Warranty Period
The builder shall bear the cost of fixing any flaws discovered in the building that the builder created during this guarantee term.
The manufacturers and suppliers of the building's appliances and materials provide warranties.
B. Building Construction Step (Phase – II)
The following procedures are followed when constructing any kind of building.
1. Obtaining site clearance
In order to prepare the site for building construction, undesired grass is removed.
Levels are created by levelling the area that looks to be hilly. Additionally, any pits that exist on the property are filled. Site clearing is the term for this kind of work on the premises.
1. Site Clearance
Levels are created by levelling the area that looks to be hilly. Additionally, any pits that exist on the property are filled. Site clearing is the term for this kind of work on the premises.
2. Excavation and PCC
3. Foundation
4. Plinth Beam or Slab
The plinth beam is appropriately shuttered before the concrete is poured. Soil is added to the vacant space between the foundation and the plinth beam after the masonry work on the prepared beam is completed in accordance with the plan.
5. Superstructure Column and Beam
6. Brick Masonry Work
Cement mortar is mixed according to the right specifications when performing masonry construction. The proportions of sand and cement are correct. A gap for windows and doors is maintained throughout masonry work, per the building's working drawing.
7. Lintel Over Door Window
- According to the workings drawing, lintels are built over windows & doors in masonry work. Masonry work is done on the lintel.
8. Floor Slab or Roof Structure
9. Plastering
Following the completion of the brickwork, plastering is done for the following reasons.
Plaster can provide the building's surface a strong, smooth finish.
The plaster can be shielded from the elements outside.
Plaster provides the structure a modern appearance.
10. Door and Window Framing and Fixations
- Then, the door & window frames are fixed to the exact position given in the working drawing.
11. Painting
- After plaster and electrical work is completed, painting is done with an initial primer coat.
12. Electrical and Plumbing
- Electrical pipes are installed in the walls & slabs as per the requirement of the point. They hide in the concrete of the slab. The end of the pipe & the point are left in front of the junction. Electric fitting is done by properly cleaning the junction box. The plumbing pipe can be terminated with a point fixture.
13. Woodwork and Fixture Fittings
The procedure of finishing plumbing, electrical and switchboard fixtures in lavatory and kitchen areas is completed.
14. Boundary Wall
- The building should be constructed according to the proper design of the compound walls after construction is completed.